Today, with the majority of the wheat drilling completed I was able to turn my attention to our Entry Level Stewardship application. Our current scheme expires in November 2010, was it really four years ago I did the last one? My plans are to have the new scheme, ELS and HLS combined up and running by this current spring, which will allow us the summer months to establish a lot of margins. Currently many of these margins are planted to a width of 2m but with increasing pressure around areas of population and a potential for us to loose certain chemicals it would be prudent to protect our operation for as long as possible and if we can get paid as well then that could be a bonus before legislation might force our hand. Chemical loss, such as Metaldyde will severely impact on our business here at Overbury. Wider margins will help reduce any soil erosion run-off, taking chemical particles with them into the water courses. Coupled with the margins I am also looking at some pollen and nectar mixes to provide feed sources for insects, which in turn will provide feed for small birds. The ELS scheme should provide us with a backbone with which to hang an HLS application on with a lot more options and interesting projects to get involved with.
Tampilkan postingan dengan label entry level stewardship. Tampilkan semua postingan
Tampilkan postingan dengan label entry level stewardship. Tampilkan semua postingan
Senin, 28 September 2009
Jumat, 24 Juli 2009
Soil Management Plan
Having reviewed our Soil Management Plan, which we undertook as part of our Entry Level Stewardship Scheme Agreement, we have needed to change a gateway to reduce the identified risk of soil erosion and run off. the field is of light soil (Cotswold Brash) is sloping between 3 and 7 degrees and is sometimes left as overwintered stubble's and summer fallow. This has put the field in the High Risk Category. The field also has a 6m grass margin a road and a gateway located at the bottom of it. (See above). In order to try and reduce the run off risk I have decided to move the gateway and bund up the soil, then grass it down, to join up the grass margin. The gateway has now been moved to the side of the field, located in the corner where the chance of run off is greatly reduced. The only problem now could be cars parking in the entrance to the gateway, as its on part of a 'T' junction so I'm off to put a sign up to 'discourage' them. Failure to keep the gateway clear, for farm machinery, will mean I will have to put a couple of removable bollards (concreted in) up to stop cars parking there altogether.
Langganan:
Postingan (Atom)